Chevrolet Lanos (since 2004 of release)
1. The car device
2. Recommendations about operation
3. Malfunctions in a way
4. Maintenance service
5. The engine
5.1. Features of a design
5.2. Compression check in cylinders
5.3. Removal and installation of mudguards of the engine
5.4. Replacement of support of a suspension bracket of the power unit
5.5. Installation of the piston of the first cylinder in position ВМТ of a step of compression
5.6. Removal, installation and дефектовка a flywheel
5.7. Replacement of details of consolidation of the engine
5.8. A head of the block of cylinders
5.9. Removal and engine installation
5.10. Engine repair
5.11. Greasing system
5.12. Cooling system
5.13. System of release of the fulfilled gases
5.14. The engine power supply system
5.15. System of catching of steams of fuel
5.16. System рециркуляции the fulfilled gases
5.16.1. Features of the device
5.16.2. Removal, check and installation of the pneumatic valve рециркуляции the fulfilled gases
5.16.3. Removal, check and installation of the electromagnetic valve of system рециркуляции the fulfilled gases
6. Transmission
7. A running gear
8. A steering
9. Brake system
10. An electric equipment
11. A body
12. Wheels and tyres
13. Purchase of spare parts
14. A trip on HUNDRED
15. Winter operation of the car
16. Preparation for checkup
17. Councils to the beginning mechanic
18. Appendices
19. Electric equipment schemes
 



cf8e4909





5-16-2-snyatie-proverka-i-ustanovka-pnevmaticheskogo-klapana-recirkulyacii-otrabotavshikh-gazov.html

5.16.2. Removal, check and installation of the pneumatic valve рециркуляции the fulfilled gases

The key on 12 is required to you.
1. Disconnect a vacuum hose from the pneumatic valve рециркуляции the fulfilled gases.
2. Turn out two bolts of fastening of the valve to an inlet pipe …
3. … also remove the valve.
    
THE NOTE
Connection of the valve with an inlet pipe is condensed by a lining. At each dismantling of connection replace a sealing lining new.

4. For valve check submit in any way depression to its vacuum chamber and observe of moving плунжера (it is shown by an arrow). If плунжер remains motionless, replace the valve.
5. Establish the pneumatic valve рециркуляции the fulfilled gases in an order, the return to removal.

The previous page
5.16.1. Features of the device
The following page
5.16.3. Removal, check and installation of the electromagnetic valve of system рециркуляции the fulfilled gases